Contact Us
Address: 227 St Pauls Terrace Fortitude Valley QLD 4006
Phone: 07 3539 0000
Close
Downloads
Spry
Web Installer
–
Updates automatically (Recommended)
Spry x64 Version
1.6.1525.0 (Recommended)
Close
Gantt Scheduler
Web Installer
–
Updates automatically (Recommended)
Gantt Scheduler x86 Version
1.2.190.0 (Recommended)
Close
License Administrator
Web Installer
–
Updates automatically (Recommended)
License Administrator x86 Version
1.0.87.0 (Recommended)
Close
Additional
USB Key Driver
–
Required for older style USB keys
.NET 4.5 Installer
–
Required for Windows 7 and older
Remote Support
–
Teamviewer Support Utility
Close
Updates
Initial State tabs now available under Scenario Settings to set pre-schedules for Source and Destination. Documentation available
here
.
Capacity, Time and Proximity Constraints now available for Source and Destination Scheduling. Documentation available
here
Update Notes
Spry 1.4.0.686 Update
Spry 1.4.0.685 Update
Spry 1.4.0.684 Update
See All Updates
Close
Close
Training
Training Courses
Source and Destination Scheduling
–
The essential Spry training, this 2 day course runs through model setup, deposit and dump scheduling. This training is run once every four weeks out of our office in Fortitude Valley.
Haulage Training
–
If you’re looking to make the most of your haul planning, this is the training you’re after. Spry Haulage training is training is run every four weeks out of our office in Fortitude Valley.
Close
Pricing
Training Pricing
Businesses
$ 1800 / day
Includes up to 4 trainees per day
All necessary resources provided
Use site specific models on any pre-arranged date
Close
In addition to the structured head office training Precision Mining Software provides, we can also offer site-based and/or customised training to suit your needs. Contact us for more information.
Close
Documentation
Spry
Official Documentation
–
Designed to be read from start to finish
Data
–
Formatting, importing and exporting
Source Scheduling
–
Constraints, dependencies and much more
Results
–
Includes the expression editor and spreadsheets
Destination Scheduling
–
Destination paths, priorities and dependencies
Haulage
–
Logic, networks and theory
Appendices
–
Reference tables and other useful resources
Appendix #1: Format Strings
Appendix #2: Date Format Strings
Appendix #3: Coefficient of Traction
Appendix #4: Rolling Resistance
Appendix #5: Estimated Material Densities
Appendix #6: Glossary of Terms
Appendix #7: Results Breakdown Table
Spry In Depth
–
Specific Spry concepts in a high level of detail
In Depth #1: TKPH
In Depth #2: The Animation Window
In Depth #3: The Input Schedule
In Depth #4: Introduction to the Expression Editor
In Depth #5: The Initial State Calculator and Initial State
In Depth #6: Solid/Triangulation Simplification
Stockpile Setup
Close
Gantt Scheduler
Official Documentation
Gantt Scheduler #1: Introduction & Setup
Gantt Scheduler #2: Processes
Gantt Scheduler #3: Areas
Gantt Scheduler #4: Tasks
Gantt Scheduler #5: Equipment
Gantt Scheduler #6: Delays
Gantt Scheduler #7: Views
Gantt Scheduler #8: Reporting
Gantt Scheduler #9: Printing
Close
Browse the various documentation here, search using the search bar below
Close
Home
>